The Central Electricity Authority's safety regulations of 8 June 2023 contain a chapter on EV charging: Chapter XI, regulations 123 to 128. It puts the socket-outlet at least 800 millimetres above the finished ground level and bans extension cords, vehicle-end adaptors and portable socket outlets. The vehicle must be within five metres of the charging point, each point needs its own sub-circuit, and each station needs earth-continuity monitoring. It also sets fire rules, owner's tests and seven years of records. Regulation 44 separately requires a residual current device of not more than 30 mA in domestic installations. Whether Chapter XI reaches a private wall-box is unsettled. This is not legal or electrical advice.

Which regulations these are, and what they replaced

The instrument is the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Its notification, No. CEA-PS-16/1/2021-CEI Division, is dated 8 June 2023 and was published in the Gazette of India: Extraordinary, Part III, Section 4. The Authority made it under section 177(2)(b), read with section 53, of the Electricity Act, 2003, and it replaced the 2010 regulations of the same name. Regulation 1(2) brought it into force "on the date of publication in the Official Gazette".

Regulation 1(3) applies it to "the person engaged in the generation or transmission or distribution or trading or supply or use of electricity". You use electricity when you charge a car, so you are inside that sentence. The open question is narrower: whether the EV chapter reaches a resident's own point.

That chapter, "Additional safety requirements for electric vehicle charging station", runs from regulation 123 to 128, on pages 144 and 145 of the Gazette. Regulation 123 says it applies "in addition to the regulations provided from chapter I to VII". The general chapters, including the residual current device rule in regulation 44 for installations up to 650 V, reach every charging point through regulation 1(3), whatever the answer on Chapter XI.

The Authority's live link now redirects to a login page, so we cite the copy archived from its own server on 1 August 2023: Gazette notification of 8 June 2023 (web.archive.org copy of cea.nic.in); last verified 16 October 2026. The Ministry of Power's Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024, dated 17 September 2024, point back to it. Their clause 6(2) says safety requirements for EV supply equipment "shall be as specified in" these regulations "as amended from time to time" (copy hosted by the Bureau of Energy Efficiency; last verified 16 October 2026; our clause-by-clause reading).

Does Chapter XI reach a private wall-box? The undefined term

Regulation 123 says Chapter XI applies "to electric vehicle charging stations", a phrase the definitions in regulation 2(1) never define. They define "electric vehicle supply equipment" at 2(1)(x) as "an element in electric vehicle charging infrastructure that supplies electric energy for recharging the battery of electric vehicles". They define "supply lead" at 2(1)(zzh), and at 2(1)(w) an "electric vehicle" is any vehicle propelled "partly or wholly, by an electric motor drawing current from a rechargeable storage battery", which takes in a scooter as much as a car.

Regulation 2(2) sends undefined words to the Electricity Act, 2003, and that route ends without an answer. The copy of the Act the Authority hosts, uploaded in 2020 (web.archive.org copy of cea.nic.in; last verified 16 October 2026), never uses the word "vehicle". The nearest definition is in the Ministry's 2024 guidelines. Clause 4(h) defines a charging station as "Premises having any one or more EVSEs or combination thereof, with or without supporting upstream infrastructure or amenities as specified in subsequent sections of these guidelines", and clause 2(i)(a) applies the guidelines to charging infrastructure located "In private parking spaces". The guidelines borrow the Authority's definitions of an electric vehicle and of supply equipment (clauses 4(f) and 4(i)) but write their own for a station, and the regulations do not adopt it.

ReadingWhat it rests onWhat it would mean for a point on your flat's meter
Narrow: a "station" in the ordinary sense of a charging businessThe undefined term, and items that only make sense for operators, such as the clearance from fuel dispensers in 124(14)Chapter XI would not bind you. Chapters I to VII, including regulation 44, still would
Broad: any premises with one or more supply equipment unitsThe Ministry's clause 4(h) definition and its application to private parkingEvery sub-regulation in Chapter XI would apply to your bay
Item by item124(2), 124(5) and 125(1) speak of "charging points", and 124(6) speaks of "electric vehicle charging" in generalThe point-level items would apply to you even if station-level items such as fire detection were read narrowly

A society's shared point is the easier case. The guidelines' clause 4(e) calls a "semi-public charging station installed at Group Housing Societies or other residential accommodations where only residents or authorized visitors can get their EV charged" a Community Charging Station, so a shared point is a "station" at least in the Ministry's vocabulary.

For a private point we cannot settle it, and we found nothing from the Authority that does. Regulation 136 does not decide scope either, but it is the route for an installation that cannot meet a requirement: an Electrical Inspector may, "by an order in writing, and reasons to be recorded", allow deviation in respect of "regulations 119 to 135 on case to case basis", and its Explanation sends every such order to the Central or State Government, "which shall have the final decision". A deviation relaxes a rule for one installation; it is not a ruling on what the chapter covers. For a new private point, our working assumption is that the chapter applies. If the broad reading proves right, a point built to the narrow one may need rework, while most of Chapter XI is designed in once by the licensed electrician who specifies the point. This is our reading, not legal advice.

Protection against overload, reverse power flow and lightning

Regulation 124(1): "Electric vehicle charging stations shall be provided with separate protection against the overload of input supply and output supply as per relevant standards." The output side sits inside the charger, so it is met by the charger's design and certification, not by anything a resident tests. The input side may be built into the charger or provided by the sub-circuit's overcurrent device under regulation 125(1); the charger's documentation and your licensed electrician should say which.

Regulation 124(8): "The electric vehicle charging station shall be equipped with a protective device against the uncontrolled reverse power flow from electric vehicle to the charging point." Ask the manufacturer for a written statement that the charger meets it, and file it with the purchase papers.

Regulation 124(7): "The lightning protection system shall be provided for the electric vehicle charging stations as per relevant standards." The text does not say whether a building's existing lightning protection counts, or whether a covered basement point needs anything more. For a shared station, the society's licensed electrician should answer in writing. For a private wall-box, it falls inside the scope question above.

Items met by the charger's design, not by you

These describe how the equipment itself behaves. The regulations name no one to check them; your part is to buy equipment whose documentation says it meets them.

  • 124(9): one second after disconnection, the voltage on accessible conductive parts must be at or below "42.4 V peak (30 Vrms), or 60 V DC", and the stored energy "less than 20 J". If not, a warning label is required.
  • 124(10): a connector used for DC charging must lock onto the vehicle inlet above 60 V DC, with a means of safe disconnection if the system malfunctions.
  • 124(11): the point must disconnect the supply if its output voltage exceeds the maximum the vehicle permits.
  • 124(12): the charging cable must not be live while the vehicle connector is unlocked.
  • 124(13): the connector must not unlock if the voltage between it and earth is "more than 60 V".
  • 125(4): the charging lead needs "an earth-connected metal shielding", with insulation that is "wear resistant and maintain flexibility over the operating temperature range".

When you compare quotes line by line, ask each supplier to name the document that covers these items.

Sockets, cords and adaptors: 800 mm, 5 metres and no portable socket outlets

Sub-regulationText as printedPlain reading
124(2)"Socket-outlet of supply of electric vehicle charging points shall be installed at least 800 millimetre above the finished ground level."Measure from the finished floor, not the bare slab
124(3)"A cord extension set or second supply lead shall not be used in addition to the supply lead for the connection of the electric vehicle to the charging point and shall not be used as a cord extension set."One lead between the point and the vehicle. No extension cord and no second lead
124(4)"No adaptor shall be used to connect a vehicle connector to a vehicle inlet."The plug at the car end must fit the car's inlet without a converter
124(5)"The distance between the charging point and the connection on the electric vehicle shall not be more than five metre during charging."The vehicle's inlet must be within five metres of the point while it charges
124(6)"The portable socket outlets shall not be permitted for electric vehicle charging."No trailing or movable socket boards

Height. The words that matter are "finished ground level". Suppose your bay will get a 50 mm floor topping after the electrician leaves, and the socket was set 820 mm above today's slab: 820 − 50 = 770 mm, below the line. Before a society uses an old parking socket, even as an interim shared point, take a tape to it.

Extension cords. Regulation 124(3) is the source for the "no extension cords" rule that our own safety checklist states without a citation. The lead from the charging point to the vehicle is the only one allowed.

Adaptors. Regulation 124(4) speaks only of the vehicle end. It does not say whether a plug adaptor at the wall end is caught. One that turns a fixed socket into a movable outlet sits close to what 124(6) bans, but the text does not settle it. Have a licensed electrician fit the socket your charger is designed for.

Five metres. The regulation does not say whether to measure in a straight line or along the lead, so plan for both. Suppose the point is on the wall at the head of your bay, you park nose-in 0.6 m from it, and your car's inlet is 3.9 m back from the front bumper (measure your own): 0.6 + 3.9 = 4.5 m before the lead bends round the bodywork. If your inlet is at the rear, reversing in would bring it close to the wall.

Portable socket outlets. These words ban a movable outlet, such as a socket board on a flex. Regulation 2(1)(zzc) says a "socket outlet" "includes a cord extension socket attached to a flexible cord that is permanently connected to installation wiring", so a socket on a flex is a socket outlet even when its cord is wired in rather than plugged in. The regulation does not name the portable charger that came with your car, but under the broad reading the fixed socket it plugs into must meet 124(2) and sit on its own sub-circuit under 125(1) (portable charger or wall-box). At a shared point, the use rules in 124(3) to (6) belong in the society's written rules.

A dedicated sub-circuit for each point, and earth-continuity monitoring

Regulation 125(1): "Each electric vehicle charging points shall be supplied individually by a dedicated sub-circuit protected by an overcurrent protective device complying with the relevant standards and the overcurrent protective device shall be part of a switchboard." That means one point per sub-circuit, protected by a device in a switchboard rather than somewhere along the cable. A society planning six points is planning six sub-circuits; how the panel carries them is for its licensed electrician (load management across several chargers).

Regulation 125(2): "Co-ordination of all protective devices in the charging stations shall be ensured." When a fault happens, the device closest to it should trip, not the one feeding the whole parking level. That is a design duty, and one thing to revisit when a charger keeps tripping something further up the line (tripping diagnosis).

Regulation 125(3): "All electric vehicle charging stations shall be provided with an earth continuity monitoring system that disconnects the supply in the event of the earthing connection to the vehicle becomes ineffective." The text does not say whether that function must sit inside the charger. A bare socket-outlet cannot monitor anything, so ask whether the manufacturer's documentation says your unit does this, and if not, ask your licensed electrician what will.

Regulation 125(5): "A protective earth conductor shall be provided to establish an equipotential connection between the earth terminal of the supply and the conductive parts of the vehicle which shall be as per the relevant standards." Chapter V says when the earth is checked: under regulation 43(ix)(c), "all earthing systems shall be tested to ensure effective earth bonding as per the relevant standards, before the electric supply lines or apparatus are energised" (earthing guide).

Three cable rules hidden in regulation 124

  • 124(15): "Only four core cable shall be used for charging points which require three phase power supply." This matters if you are weighing a three-phase point.
  • 124(16): "Underground cables shall not cross the underground oil tank or oil pipeline." If your premises has a buried fuel tank or line, for a generator for example, the route has to avoid crossing it.
  • 124(17): underground cables "through the charging area or vehicles passage shall be avoided and if provided shall be at a minimum depth of one metre from the finished ground surface". A trench across a driveway is a last resort, and if it is dug, it goes one metre down (cable routing options).

Enclosures, fire detection and alarm

Regulation 126(1): "The enclosure of electric vehicle supply equipment shall be made of fire retardant material with self-extinguishing property and free from halogen." This is about the equipment, so it is met by design. Ask for the manufacturer's declaration on the enclosure material and keep it with your records.

Regulation 126(2): "The fire detection, alarm and control system shall be provided as per relevant standards." No standard is named; regulation 2(1)(zze) only gives an order of precedence, starting with "Indian Standard". For a shared station, the society should ask its licensed electrician, and whoever maintains the building's fire system, to say in writing whether the bays are covered by detection and alarm. For a private wall-box this is the hardest item to apply: a building-level system one resident cannot install alone, inside the unsettled scope question.

The state fire and building texts for basements are covered in our page on basement, podium and puzzle-parking rules, and society-wide planning in our EV fire-safety guide. One more item, 124(14), sets the clearance between an "oil or gas dispenser" and a charging point "as per the order issued by the Authority". It matters only where a fuel or gas dispenser stands near a charging point, as at a fuel station.

The owner's tests and the seven-year records

Regulation 127: "The owner of the charging station shall ensure that the tests as specified in the manufacturer's instructions for the residual current devices and the charging station have been carried out." The regulation adds no testing interval of its own. The interval is whatever the manufacturer's instructions say.

Regulation 128 sets out the records. The owner of the charging station "shall keep":

  1. "records of design, construction and labelling to be compatible with a supply of standard voltage at a nominal frequency of 50 Hz" (128(1)): the installer's drawings and the charger's rating label and data sheet;
  2. "records of the relevant test certificates as indicated in these regulations and as per the relevant standards" (128(2));
  3. "records of the results of every inspection, testing and periodic assessment and details of any issues observed during the assessment and any actions required to be taken in relation to those issues" (128(3)): in practice, a dated log.

Regulation 128(4) requires all of these to be kept "either in hard form or in electronic form, for at least seven years", and a copy given "to the officials during the inspection". The regulation does not say when the seven years start; counting from the date of each record is the plain reading. Suppose a test is done on 10 March 2027: on that reading, its record is kept until at least 10 March 2034. Our guides to the paperwork to keep and an owner's maintenance routine turn this into a folder and a log.

"Owner of the charging station" is not defined either. Our reading is whoever owns the equipment, which gives a different owner in each set-up:

  • A private point on your flat's meter. You, unless a tenant bought it; then the tenancy paperwork should say who holds the records and what happens on leaving (tenant and landlord addendum).
  • A society's shared point. The society. Seven years can outlast several managing committees, so the file belongs in the society's records, not on one office-bearer's phone.
  • An operator's station inside the society. The operator that owns the hardware. Write the society's right to copies of the regulation 127 test results and regulation 128 records into the agreement, along with who hands over which papers if ownership later passes to the society (checking an operator deal).

The 30 mA RCD rule for domestic installations

Regulation 44, in Chapter V (installations up to 650 V), reads: "The use of electricity to electrical installation, shall be controlled by a residual current device to disconnect the supply having rated residual current and duration as per the relevant standards". Its first proviso adds: "Provided that in domestic installation, residual current device having residual operating current not exceeding 30 milliampere shall be used". A second proviso says the device "shall not be required for supply lines having protective devices which are effectively bonded to the neutral of supply transformers and conforming to regulation 76".

Read plainly, every installation needs a residual current device unless the second proviso applies, and in a domestic installation its operating current must not exceed 30 mA. "Domestic installation" is not defined. A point on your flat's own domestic connection is the plainest case; a society's shared point on a common-area supply may or may not count, and if it does not, the main text still requires a device rated "as per the relevant standards".

The regulation sets a sensitivity ceiling, not a device type. The type comes from the charger's installation manual and the licensed electrician fitting the circuit (RCCBs, MCBs and RCBOs explained). Where Chapter XI applies, regulation 127 makes testing it the owner's duty.

Who carries each duty: resident, society, installer or operator

Only regulations 127 and 128 name a duty-holder, the "owner of the charging station"; the rest speak in the passive voice. The table is our reading of who makes each item happen in practice. It is not a ruling.

RequirementPrivate point on your flat's meterSociety's shared pointOperator's station in the society
Equipment design: 124(1) output side, 124(9) to (13), 125(4), 126(1)The manufacturer, through design and certification. You keep the declarationThe manufacturer. The society keeps the declarationThe manufacturer. The operator keeps it; the society asks for a copy
Installation: 124(1) input side if not inside the charger, 124(2), 125(1), 125(2), 125(5), 124(15) to (17)Your licensed electrician, on your instructions and along the route the society approvedThe society's licensed electrician or contractorThe operator's installer, along a route the society approved
Use: 124(3), 124(4), 124(5), 124(6)You, and anyone who uses your pointEach user, under the society's written rulesEach user, under the operator's terms
Station level: 124(7), 124(8), 125(3), 126(2)Unsettled. Ask your installer to state in writing what covers each itemThe society, advised in writing by its licensed electricianThe operator, using the building's systems where the society agrees
Residual current device: 44Fitted by your licensed electrician; tested by you as the manual says (127, if Chapter XI reaches your point)Fitted by the society's electrician; tested by the societyFitted and tested by the operator
Tests and records: 127, 128You, for at least seven years, if Chapter XI reaches your pointThe society, held in its recordsThe operator, with copies to the society by agreement

For what an electrician inspects on the day, see our site assessment guide.

Checking for amendments before you rely on this

Everything quoted here is from the notification of 8 June 2023 as archived. We could not obtain the text of any later amendment, so we describe none: the Authority's live site redirects to a login page, and we found no archived or gazette copy.

The Authority's own list of draft regulations, archived on 1 October 2026, includes a "Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) (1st Amendment) Regulations, 2025", dated 5 August 2025 in that list (web.archive.org copy of cea.nic.in; last verified 16 October 2026). The same list still carries the 2022 draft of the principal regulations, so being listed says nothing about status, and the draft's own text is not in the archive. Press coverage describes an amendment notified in 2026; we could not obtain its gazette text, so we do not describe its contents or say whether it touches Chapter XI. Do not rely on any summary that does not quote it.

  • Search the e-Gazette of India (egazette.gov.in) for notifications from the Central Electricity Authority that name these regulations, and read any you find in full.
  • Ask your state's Electrical Inspectorate, or your licensed electrician, which version they work to, and ask them to name the notification.
  • Recheck the quotations above against any amendment before you put them in a society resolution or a purchase document.

Common questions

Can I charge my EV through an extension cord?

Not at a point Chapter XI covers. Regulation 124(3) says a cord extension set or second supply lead "shall not be used in addition to the supply lead", and 124(6) says portable socket outlets "shall not be permitted" for EV charging. Whether the chapter reaches a private point is unsettled; we assume it does for a new point.

How high must an EV charging socket be?

Where Chapter XI applies, at least 800 millimetres above the finished ground level, under regulation 124(2), measured from the floor as finally laid.

Is a 30 mA RCD required for a home EV charger?

Regulation 44's first proviso requires a residual current device "not exceeding 30 milliampere" in a domestic installation, and a point on your flat's domestic supply is the plainest case. The device type is for your charger's manual and your licensed electrician.

How long must EV charger test records be kept?

At least seven years, in paper or electronic form, under regulation 128(4), by the owner of the charging station: the society or operator for a shared point, and you for a private one if Chapter XI reaches it.

Does Chapter XI ban the portable charger that came with my car?

It bans portable socket outlets, not the charger. Under the broad reading, the fixed socket it plugs into must be at least 800 millimetres up, on a dedicated sub-circuit, with no extension added.

Do these rules apply to an electric scooter charged from a socket?

A scooter is an "electric vehicle" under regulation 2(1)(w). Whether its socket counts as a charging station is the same unsettled question as for a wall-box (two-wheeler charging in apartments).

Has a 2026 amendment changed Chapter XI?

We could not obtain the gazette text of the amendment reported in 2026, so we cannot say whether it touches Chapter XI. Check the e-Gazette and ask your state's Electrical Inspectorate before relying on any summary.